Siemens AG Headquarters office is located in the historical center of Moscow in Legion-II Business center.
The project covered not only offices but also entry zone, atrium, restaurant, conference hall and VIP zone, as well as technical premises, underground levels and external utilities.
The project design is developed in accordance with state of the art technologies to ensure LEED (Gold) standard certification requirements.
Presentation materials are provided by the ABD Architects company (www.abdcom.ru).
Stages 1-2. Concept and Tender documentation.
- Engineering equipment, utilities, list of engineering and technical measures:
- Ventilation system (from the floor drawn-off points);
- Air conditioning (from the floor drawn-off points);
- Smoke ventilation (smoke exhaust system);
- Building perimeter heating system (modification);
- Hot and cold water supply (from the floor drawn-off points);
- Sewerage;
- Power supply;
- Basic, emergency and evacuation lighting;
- Fire cabinets;
- Sprinkler system;
- Fire alarm and announcement system;
- Special server room ventilation system;
- Illumination level calculation;
- Security signaling system;
- Access control;
- CCTV;
- Optimized communication networks;
- Gaseous fire suppression system for the server room.
Stage 3. Permitting assistance.
Stage 4. Tendering assistance.
Stage 5. Author's supervision.