Mixed-use A-class business center ‘Legion II’ project had been successfully completed in 2008.
Advanced technologies, high-quality construction materials, floor-to-ceiling windows looking out on the Kremlin and the old Moscow and effective space-planning solutions make ‘Legion II’ a fine specimen of modern architecture.
Engineering equipment, utilities, list of engineering and technical measures:
- Domestic and production waste sewerage system;
- Storm sewage system;
- Drinking and fire fighting water supply system;
- Electric power supply systems (distribution transformer substation, repair and maintenance);
- Electrical power equipment;
- Electric lighting;
- Lightning protection and grounding;
- Fire alarm system and alert signal;
- Automatic fire suppression system (APT);
- Security alarm and access control;
- CCTV;
- Telecommunication network (SCS, ATS);
- Television;
- Broadcasting system;
- Electric clock system;
- Automated gear control system (low current communication systems);
- Dispatcher system (BMS);
- Automatic system for commercial measurement of power consumption.